Flooding in the Rio Grande area has caused disruptions to bridge operations. Heavy rain led to a rise in water levels, affecting the surrounding area. As a result, both international bridges were closed temporarily.

The closure occurred late at night, with officials taking action to ensure safety. One of the bridges, International Bridge II, has since reopened, but this is subject to change. The situation is being continuously assessed, and operations may be suspended again if necessary.

Further information on the status of the bridges and the flooding is available from local officials in Eagle Pass. Details on the current situation and any updates can be found through news outlets.